The Report
Writes Itself
Stop formatting Word docs. Turn data into client-ready reports in minutes.
Schedule a Demo
Select Template
Choose your audit standard
Energy Survey
Detailed Analysis
Energy Management
Build Your Own
One-Click Reports
Select a template. Watch it build.
Smart Templates
ASHRAE, ISO, or custom.
Data Binding
Pulls data from Workbench.
Instant Draft
Full reports in 60 seconds.
Full draft in 60 seconds
Select a standard, click generate. We build the structure, summary, and appendices—populated with your data.
Generating Report...
ASHRAE Level 2 Audit
45% Complete
AI Writer
AI drafts summaries and technical details.
Context Aware
Understands your facility.
Tone Adjustment
Adjust tone instantly.
Recommendation Engine
Suggests next steps.
Writes like an engineer
AI drafts descriptions, summaries, and recommendations that sound professional. Adjust tone with one click.
Executive Summary
Section 1.0
Based on the comprehensive analysis of the manufacturing facility located at 123 Industrial Drive, we observed significant opportunities for energy efficiency improvements across multiple systems.
The chiller plant, operating at 15% below optimal efficiency, represents the single largest opportunity for energy savings. By implementing variable frequency drives on the primary pumps and optimizing the control sequence, we project annual savings of $45,000 with a simple payback period of 1.8 years.
Additional measures including LED lighting retrofits and compressed air leak repairs will contribute an estimated |
Dynamic Charts
Branded charts embedded automatically.
Auto-Embed
Charts flow into text
Interactive Legends
Interactive tooltips
Style Matching
Match brand colors
Charts that tell stories
Usage, costs, ROI—rendered as quality charts that flow into your text. No copy-paste from Excel.
Energy Savings Analysis
The proposed VFD installation on the primary chiller pumps demonstrates significant energy reduction potential. Figure 1 illustrates the baseline energy consumption compared to the projected post-implementation usage.
Baseline vs. Proposed Energy Usage
Figure 1As demonstrated in the analysis above, the implementation of variable frequency drives results in a 17.3% reduction in annual energy consumption, translating to $10,918 in annual cost savings.
Standards, Not Headaches
We've pre-built the templates for ISO 50001, ASHRAE Level 2/3, and local mandates so you don't have to start from scratch.
ISO 50001
Full compliance structure ready to go.
ASHRAE Level 2/3
Audit templates that actually meet the standard.
Local Mandates
NYC LL97, CA Title 24, and more.
You do the engineering, we'll handle the formatting
Stop fighting with Word templates. Select your audit standard (ASHRAE Level 2, Level 3, etc.), and Reporter automatically structures your document to match. You focus on the content; we ensure it's compliant.
Select Audit Standard
Document structure will auto-adjust
Energy Survey and Analysis
Detailed Analysis and Implementation
Energy Management System
Build your own structure
Deliver What They Need
Your client wants a Word doc? No problem. Need a PDF for the bank? Done.
PDF & Word
Perfectly formatted, every time.
Client Portal
Or just send them a secure link.
Whitelabeling
Your logo, your colors, your report.
Stop reformatting for every client
Write your report once, and export it to whatever format your client demands—PDF, Word, or even PowerPoint for the executive summary. It always looks professional, and it's always on brand.
Export Report
Choose your format
No More Email Chains
Stop emailing 'Report_v3_FINAL_REAL.docx' back and forth.
Inline Comments
Comment directly on the report.
Version History
See who changed what and when.
Approval Workflow
Streamlined review process.
Get it approved without the headache
Collaborate with your team in real-time. Junior engineers draft, seniors review with inline comments, and managers approve. It's a seamless workflow that keeps everyone on the same page.
Financial Analysis
The proposed VFD installation requires an initial capital investment of $4,500. Based on annual energy savings of $10,918, the simple payback period is calculated at 0.41 years.
Can we adjust the ROI calculation here to include maintenance costs?
Updated. See revised section below.
The return on investment (ROI) over a 5-year period, accounting for maintenance costs, is projected at 240%.
The Clipboard Era is Over
You didn't get an engineering degree to format Word documents. Join the early access program and get back to the work that matters.